当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:   同样,带材从二层平台经过一涂一烘后经过托辊和对中装置转向,进入面漆涂(G5、G6)、烘(G7)工序,然后冷却,空气吹扫后,根据客户要求经压花机或覆膜进入出口储料机组。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
   同样,带材从二层平台经过一涂一烘后经过托辊和对中装置转向,进入面漆涂(G5、G6)、烘(G7)工序,然后冷却,空气吹扫后,根据客户要求经压花机或覆膜进入出口储料机组。
问题补充:

  • 匿名
2013-05-23 12:21:38
Similarly, the strip material from the second floor platform after a coating of a baking after the roller and steering device for entering the finishing coat (G5, G6), drying (g7) step, and then cooled, after purging the air, according to customer requirements access to export embossing machine or c
  • 匿名
2013-05-23 12:23:18
Similarly, with supplies from the 2nd floor and a platform is a bakery after the roller and in turn, to go to the paint finish (G G 6) , 5 , 7) bake (G operation, and then cooling, air blow-off, according to customer's requirements by Embossers or laminate entered the export recovery units.
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
   Similarly, the Strip from a two-story platform after a coating after drying idler and the shifting device, enter the finishing coat (G5, G6), drying (G7) operation, then cooled, after purging the air, embossing machines according to customer requirements or film access to export storage unit.
  • 匿名
2013-05-23 12:28:18
   Similarly, as soon as as soon as the strip passes through after the attic spreads dries the process supporting roller and installs to changes, enters the finish coat to spread (G5, G6), dries (G7) working procedure, then cooling, after the air blows sweeps, enters according to the customer reques
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭