当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:在面对枢纽的新的战略特征挑战下,现有设计原则对公共安全的分割管理的旧有模式、各阶段公共安全建设的衔接脱节和各部门安全管理的不连续性,都导致了传统枢纽的施工组织设计原则设立与我国所需的“大安全观”建设产生偏离。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
在面对枢纽的新的战略特征挑战下,现有设计原则对公共安全的分割管理的旧有模式、各阶段公共安全建设的衔接脱节和各部门安全管理的不连续性,都导致了传统枢纽的施工组织设计原则设立与我国所需的“大安全观”建设产生偏离。
问题补充:

  • 匿名
2013-05-23 12:21:38
In the face of the hub of the new strategic characteristics challenge the existing design principles for public safety division of the old model, management discontinuity convergence disjointed at various stages of construction of public safety and security departments, have led to the traditional h
  • 匿名
2013-05-23 12:23:18
In the face of the new strategic hub features, existing design principles to public security management division of the old mode, the stage of the Public Safety Building and bridging the gap between the departmental safety management is not continuity, has led to a traditional hub of construction or
  • 匿名
2013-05-23 12:24:58
In faces the key position under the new strategic characteristic challenge, the existing principle of design has the pattern, various stages public security construction engagement old to the public security division management comes apart with various departments safety control discontinuity, all c
  • 匿名
2013-05-23 12:26:38
Under the new strategy features challenges in the face of hub, existing design principles to the public security division of management patterns of old, out of touch interface between the various stages of construction of public security and security management in all sectors of discontinuities, res
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭