当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:●防治污染工程的设计与主体工程设计融为一体,随着奥运工程陆续建成,相应的环保配套工程设施也陆续进入收尾阶段是什么意思?

待解决 悬赏分:1 - 离问题结束还有
●防治污染工程的设计与主体工程设计融为一体,随着奥运工程陆续建成,相应的环保配套工程设施也陆续进入收尾阶段
问题补充:

  • 匿名
2013-05-23 12:21:38
● The engineering design of the prevention and control of pollution, with the main project design integration, with the Olympic projects coming on stream, the corresponding supporting environmental engineering facilities have gradually entered the final stage
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
* The preventing and controlling pollution project design and the principal part of a project design merges into one organic whole, completes one after another along with the Olympic Games project, the corresponding environmental protection conveyance system facility also one after another enters th
  • 匿名
2013-05-23 12:26:38
Pollution prevention project design blend in with the design of the main project as a whole, as the Olympics projects being built, the corresponding supporting projects of environmental protection facilities are gradually entering the closing stages
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭