|
关注:1
2013-05-23 12:21
求翻译:The plans are moving along well, we are doing all grading and earthworks , calculations and quantities. This is the most critical and time consuming part of the design as all inputs and engineered drawings have to be done by hand first , then gone over and inputted into the computer due to all the curves in golf course是什么意思? 待解决
悬赏分:1
- 离问题结束还有
The plans are moving along well, we are doing all grading and earthworks , calculations and quantities. This is the most critical and time consuming part of the design as all inputs and engineered drawings have to be done by hand first , then gone over and inputted into the computer due to all the curves in golf course
问题补充: |
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区