当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:安装螺栓拆除后,孔的四周及孔壁亦按上述要求涂层。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
安装螺栓拆除后,孔的四周及孔壁亦按上述要求涂层。
问题补充:

  • 匿名
2013-05-23 12:21:38
After the demolition of the mounting bolts around the hole and the hole wall coating according to the above requirements.
  • 匿名
2013-05-23 12:23:18
Mounting bolts removed, the hole 4 and hole week as described above is also called wall coating.
  • 匿名
2013-05-23 12:24:58
After installs the bolt demolition, the hole all around and the opening wall also presses the above request coating.
  • 匿名
2013-05-23 12:26:38
Install bolts removed, around the hole and the hole wall coating according to these requirements.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭