求翻译:101和102工房的空调送风管布局与原设计出入较大,且总包单位提供的方案中空调送风管不宜穿过本系统无关房间(除尘间)。由于原设计方案中的风管布局是经法方确认过的,总包单位提供的方案需法方进行再次确认。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
101和102工房的空调送风管布局与原设计出入较大,且总包单位提供的方案中空调送风管不宜穿过本系统无关房间(除尘间)。由于原设计方案中的风管布局是经法方确认过的,总包单位提供的方案需法方进行再次确认。
问题补充:

  • 匿名
2013-05-23 12:21:38
101 and 102 of air conditioning pipe layout with the original design of the Kobo and out, and the total package units program should not pass through the air conditioning blower duct system independent of the room (dust between). Since the original duct design layout is recognized by the French side
  • 匿名
2013-05-23 12:23:18
The 101 and 102 of the air-conditioned air supply tube layout with the original design, there is considerable variation between units and a total package of the program provided in air-conditioned supply air through the tube is not the system-independent rooms (dust). In the original design of the
  • 匿名
2013-05-23 12:24:58
101 and 102 workshop air conditioning wind pipe layouts are big with the original design difference, also always wraps in the plan which the unit provides the air conditioning wind pipe to pass through this system to have nothing to do with not suitably the room (dust removal).Because in the origina
  • 匿名
2013-05-23 12:26:38
101 and 102 ft larger air conditioning pipe layout and original design, and the total package unit air conditioning pipes should not be in the programme provided through the system-independent room (dust). Since the original design of the wind pipe layout is confirmed by the French, General Contract