当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:11. 凡进出人防区的电力、照明线路均在出入口处按照人防要求进行防火和密闭处理。接地系统、电气预埋、管线预留孔施工时需电气专业施工人员密切配合土建专业施工人员施工,电气专业施工人员需查对土建施工是否满足电气要求,发现问题及时纠正。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
11. 凡进出人防区的电力、照明线路均在出入口处按照人防要求进行防火和密闭处理。接地系统、电气预埋、管线预留孔施工时需电气专业施工人员密切配合土建专业施工人员施工,电气专业施工人员需查对土建施工是否满足电气要求,发现问题及时纠正。
问题补充:

  • 匿名
2013-05-23 12:21:38
11 Where electricity, lighting circuits out of the civil air defense zone in entrance and exit requirements in accordance with the civil air defense fire and confined handling. Grounding systems, electrical, embedded, when the the pipeline earmarked hole construction the electrical professional cons
  • 匿名
2013-05-23 12:23:18
11.where people access the power, lighting zone lines are in import and export in accordance with the requirements for fire defense and confined. Electrical grounding system, pre-ground, pipeline construction, pre-drilled holes for electrical professional who works closely with the professional who
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
11. access person stand-by electrical, lighting line both entrances in accordance with civil defense requirement for fire and closed. , Electrical grounding systems embedded electrical engineering when reserved hole construction, pipeline construction personnel work closely with the civil constructi
  • 匿名
2013-05-23 12:28:18
11. Every turnover civil air defense area electric power, the illuminating line request in the access place according to the civil air defense to carry on the fire protection and airtight processing.The earth system, the electricity bury, when in advance the pipeline reservation hole construction ne
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭