当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:2. 电气施工中应及时与土建专业配合预埋电气管线及各种设备的固定构件等。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
2. 电气施工中应及时与土建专业配合预埋电气管线及各种设备的固定构件等。
问题补充:

  • 匿名
2013-05-23 12:21:38
Electrical construction and civil engineering profession with the the embedded electrical lines and a variety of equipment fixed member.
  • 匿名
2013-05-23 12:23:18
2.electrical in the construction should be timely and construction professional with pre-buried electrical lines and a variety of devices, such as the fixed components.
  • 匿名
2013-05-23 12:24:58
2. In the electrical construction should promptly in advance bury the electrical pipeline and each kind of equipment fixed component with the construction specialized coordination and so on.
  • 匿名
2013-05-23 12:26:38
2. timely for electrical construction and civil engineering professionals combined with embedded electrical piping and equipment of a fixed component, and so on.
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭