当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:由于TES系统不可用,岭澳3号机运行时产生的工艺废物无法处理,积压于NX厂房,导致NX厂房部分区域的剂量水平升高,使工作人员受到无谓的剂量照射,同时为机组的运行带来不便是什么意思?

待解决 悬赏分:1 - 离问题结束还有
由于TES系统不可用,岭澳3号机运行时产生的工艺废物无法处理,积压于NX厂房,导致NX厂房部分区域的剂量水平升高,使工作人员受到无谓的剂量照射,同时为机组的运行带来不便
问题补充:

  • 匿名
2013-05-23 12:21:38
Tes unavailable, the the Lingao machine runtime process waste can not handle the backlog nx plant lead to the nx plant part of the region of the dose levels and the staff to be unnecessary dose exposure, as well as the operation of the unit inconvenience
  • 匿名
2013-05-23 12:23:18
The system is unavailable, TES Ling'ao No. 3 is running the process could not be dealt with waste, the backlog of NX NX plant, resulting in plant part of the area of the dose levels rise, so that staff have been senseless dose, while running the unit for any inconvenience
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
Because the TES system is unavailable, lingao, 3rd of the mount process wastes are unable to process backlogs in NX plant, resulting in elevated dose levels of NX portions of plants, unnecessary doses of radiation to the staff, while inconvenient unit operation
  • 匿名
2013-05-23 12:28:18
Because TES system not available, when range Australia 3 machine movements produces the craft waste is unable to process, piles up in the NX workshop, causes the NX workshop partial regions the dosage level ascension, causes the staff to receive the senseless dosage illumination, simultaneously brin
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭