当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:用户收到发货后, 请及时开箱验收, 测量导管长度是否符合要求, 检查运输中有无破坏性松动, 打开接线盒盖, 接通指示灯, 将浮球上下移动, 检验发迅是否正常。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
用户收到发货后, 请及时开箱验收, 测量导管长度是否符合要求, 检查运输中有无破坏性松动, 打开接线盒盖, 接通指示灯, 将浮球上下移动, 检验发迅是否正常。
问题补充:

  • 匿名
2013-05-23 12:21:38
User after receipt of the shipment, unpacking acceptance, measuring catheter length to meet the requirements, check transport any destructive loose, open the junction box cover, turned on the lights, the float moves up and down, inspection fat fast is normal .
  • 匿名
2013-05-23 12:23:18
Users receive After shipping, please keep out-of-the-box testing, catheter length measurement, check whether it meets the requirements in a non-destructive loose, open the connection box cover, turn on lights, will float up and down, and verify that the Centrino is normal.
  • 匿名
2013-05-23 12:24:58
After the user receives delivers goods, please promptly open a box the approval, surveys the drive pipe length whether conforms to the requirement, in the inspection transportation whether there is does destructiveness become less crowded, turns on the wiring lid, puts through the indicating lamp, r
  • 匿名
2013-05-23 12:26:38
User received after shipment, please open the box and acceptance, measuring catheter length whether it meets the requirements, check the transport for destructive loose, open the junction box cover, power led, will float up and down, test whether the address correctly.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭