当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Together with the Gut Marienhof plant each day 560,000 cubic meters of wastewater from Munich’s households and the industry in the surrounding region is treated. Since the end of 1998, a wastewater sludge incineration plant has also been operated on the site, in which the wastewater sludge is thermally processed and th是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Together with the Gut Marienhof plant each day 560,000 cubic meters of wastewater from Munich’s households and the industry in the surrounding region is treated. Since the end of 1998, a wastewater sludge incineration plant has also been operated on the site, in which the wastewater sludge is thermally processed and th
问题补充:

  • 匿名
2013-05-23 12:21:38
Marienhof酒店与肠道厂每一天560000立方米,慕尼黑周边地区的家庭和行业的废水处理。自1998年年底以来,废水污泥焚烧厂也已在网站上操作,其中污水污泥热环境友好的方式处理,因此处理的。
  • 匿名
2013-05-23 12:23:18
在一起的,凭直觉marienhof植物每一天560000立方米的废水从慕尼黑的家庭和工业在其周围区域的处理方式。 自1998年底,一个污水处理污泥焚烧厂也已在网站上操作,其中废水处理污泥是散热的处理,因此在一个环境友好的方式。
  • 匿名
2013-05-23 12:24:58
与每天食道Marienhof植物一起560,000立方米污水从慕尼黑的家庭和产业在周围的区域被对待。 从1998年年底,污水烂泥焚化工厂在站点也运作了,污水烂泥热量地被处理并且被处理用一个环境友好的方式。
  • 匿名
2013-05-23 12:26:38
与肠 Marienhof 植物被视为 560,000 立方米的污水从慕尼黑的家庭和周边地区产业的每一天。自 1998 年年底,废水污泥焚烧厂也已运作在网站上,其中废水污泥是散热处理,因此以环保的方式处置。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭