|
关注:1
2013-05-23 12:21
求翻译:协助工程总监负责管理整个酒店大楼的建筑、装饰、工程仓库是什么意思? 待解决
悬赏分:1
- 离问题结束还有
协助工程总监负责管理整个酒店大楼的建筑、装饰、工程仓库
问题补充: |
|
2013-05-23 12:21:38
Assist the Director of Engineering is responsible for managing the entire construction of the hotel building, decoration, engineering warehouse
|
|
2013-05-23 12:23:18
Assist director of engineering is responsible for the overall management of the building construction, decoration, engineering warehouse
|
|
2013-05-23 12:24:58
The assistance project inspector general is responsible to manage the entire hotel building the construction, the decoration, the project warehouse
|
|
2013-05-23 12:26:38
Assist the Project Director will be responsible for managing the entire hotel building, architecture, decoration, engineering warehouse
|
|
2013-05-23 12:28:18
assist project director is responsible for the overall management of the building of the hotel building, decoration, engineering warehouse;
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区