当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:7本毕业论文为上海A11公路拓宽改建工程花桥互通式立体交叉管理用房施工组织设计。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
7本毕业论文为上海A11公路拓宽改建工程花桥互通式立体交叉管理用房施工组织设计。
问题补充:

  • 匿名
2013-05-23 12:21:38
7 thesis of Shanghai A11 highway Widening project management space Huaqiao Interchange interchange construction design.
  • 匿名
2013-05-23 12:23:18
This Diploma thesis for shanghai A 7 11 highway bridge conversion works broadening exchange-type three-dimensional cross-cutting management organization for construction design.
  • 匿名
2013-05-23 12:24:58
7 graduation theses use the room construction organization plan for the Shanghai A11 road development reconstruction project flower bridge intercommunication type separate grade crossing management.
  • 匿名
2013-05-23 12:26:38
7 this thesis for the A11 highway widening reconstruction project of Shanghai Huaqiao interchange construction organization design of management building.
  • 匿名
2013-05-23 12:28:18
7 graduation theses use the room construction organization plan for the Shanghai A11 road development reconstruction project flower bridge intercommunication type separate grade crossing management.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭