当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:当直放站在地图范围之内时,手动控制优先级别最高,意思是手动可以控制PA开关,但是在手动关闭之后必须手动才能打开是什么意思?

待解决 悬赏分:1 - 离问题结束还有
当直放站在地图范围之内时,手动控制优先级别最高,意思是手动可以控制PA开关,但是在手动关闭之后必须手动才能打开
问题补充:

  • 匿名
2013-05-23 12:21:38
When the repeater within the scope of the map, the manual control of the highest priority, meaning pa switch can be controlled manually, but must manually be opened manually shut down after
  • 匿名
2013-05-23 12:23:18
When the map has been placed on site is within the scope of the manual control highest priority, meaning you can control manually is PA switch, but when it is turned off while in the manual must be manually before you can open
  • 匿名
2013-05-23 12:24:58
When upends stands when the map scope, the hand control rank is first highest, the meaning is manual may control the PA switch, but after manual closure must manual be able to open
  • 匿名
2013-05-23 12:26:38
When the Repeater is within the scope of the map, manual control with highest priority, meaning that manual can control PA switch, but will be manually turned off before you must manually open
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭