当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Combustion air system and safety design :1.A pressure test is carried out when the installation of combustion air pipes on kiln is completed ,pumping compressed air into main and branch pipes of combustion air with 1.5~2 times higher pressure than normal gas and applying soap water to the area of connections ,keeping c是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Combustion air system and safety design :1.A pressure test is carried out when the installation of combustion air pipes on kiln is completed ,pumping compressed air into main and branch pipes of combustion air with 1.5~2 times higher pressure than normal gas and applying soap water to the area of connections ,keeping c
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭