当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Silva: We have to take in account the process parameters, fixtures and the choice of horn in the manufacturing process? Before we can decide of change in the ultrasonic line should all manufacturing parameters been tested and verified (for example welding time, horn type, frequency, fixture, pressure etc…)是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Silva: We have to take in account the process parameters, fixtures and the choice of horn in the manufacturing process? Before we can decide of change in the ultrasonic line should all manufacturing parameters been tested and verified (for example welding time, horn type, frequency, fixture, pressure etc…)
问题补充:

  • 匿名
2013-05-23 12:21:38
席尔瓦:我们要在制造过程中的工艺参数,装置和喇叭的选择吗?之前,我们可以决定的超声波线的变化,所有的生产参数进行了测试和验证(例如焊接时,喇叭型,频率,夹具,压力等...)
  • 匿名
2013-05-23 12:23:18
席尔瓦先生:我们要考虑到这一过程参数、装置及所选择的喇叭在制造过程? 然后我们才可以决定,更改在超声波线路都应该制造参数已经过测试和验证(例如焊接时间、喇叭类型、频率、固定装置、压力等......)
  • 匿名
2013-05-23 12:24:58
森林区: 我们在帐户在制造过程中必须采取过程参数、装置和垫铁选择? 在我们可以决定在超音波线上之前的变化如果所有制造业参量被测试和核实(例如焊接时间、垫铁类型、频率,装置,等等迫使)
  • 匿名
2013-05-23 12:26:38
席尔瓦: 我们得采取的帐户,并为此工艺参数、 固定装置和喇叭在制造过程中的选择吗?我们可以决定的前超声波生产线的改变应所有制造参数经过测试和验证 (例如焊接时间、 喇叭型、 频率、 夹具、 压力等。 … …)
  • 匿名
2013-05-23 12:28:18
Silva:我们必须吸收帐户过程参数,预定日期和选择闯入制造过程?我们可以在超声线方面的变化的决定之前应该所有制造参数测试和确认 ( 例如焊接时间,角类型,频率,预定日期,压力等等 ...)
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭