|
关注:1
2013-05-23 12:21
求翻译:Any deterioration of, or damage to paintwork etc, which may occur during the intervening period until the equipment is taken over shall be made good at the Contractor’s expense.是什么意思? 待解决
悬赏分:1
- 离问题结束还有
Any deterioration of, or damage to paintwork etc, which may occur during the intervening period until the equipment is taken over shall be made good at the Contractor’s expense.
问题补充: |
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区