当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:本工程考虑到施工工期、质量、安全和合同要求,故在选择方案时,应充分考虑以下几点:是什么意思?

待解决 悬赏分:1 - 离问题结束还有
本工程考虑到施工工期、质量、安全和合同要求,故在选择方案时,应充分考虑以下几点:
问题补充:

  • 匿名
2013-05-23 12:21:38
The project taking into account the construction period, quality, safety, and contractual requirements, it should fully consider the following options:
  • 匿名
2013-05-23 12:23:18
To take into account the engineering construction project, quality, security and contract requirements, and in the selection of programs should be fully taken into account, the following points:
  • 匿名
2013-05-23 12:24:58
This project considers the construction time limit for a project, the quality, the security and the contract requirement, therefore when choice plan, should consider following several points fully:
  • 匿名
2013-05-23 12:26:38
Construction of this project taking into account the duration, quality, safety, and contract requirements, so while it is being selected, should fully take into account the following several points:
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭