当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:For casting aluminum piston above the pin boss shrinkage holes problem in the casting process, according to the reasons for the formation of the holes from the multi-pronged approach,such as mold design optimization, casting equipment configuration and improvement of casting process production-proven, proposed five sol是什么意思?

待解决 悬赏分:1 - 离问题结束还有
For casting aluminum piston above the pin boss shrinkage holes problem in the casting process, according to the reasons for the formation of the holes from the multi-pronged approach,such as mold design optimization, casting equipment configuration and improvement of casting process production-proven, proposed five sol
问题补充:

  • 匿名
2013-05-23 12:21:38
铸造铝活塞销孔缩孔问题在铸造过程中,以上的原因形成的孔,透过多管齐下的方法,如优化模具设计,铸造设备的配置和完善的铸造工艺生产验证的提出了五个解决方案,有效地解决了问题的销孔孔,产品质量符合技术要求的产品的最终目的。
  • 匿名
2013-05-23 12:23:18
用于铸造铝制活塞销座上方收缩孔的问题铸造流程中,根据的原因形成的孔内,从多管齐下的做法,如模具设计优化、浇铸设备配置和改善铸造流程的生产验证,提出了五项解决方案来有效地解决这一问题的针孔老板,最终目的的产品质量满足技术要求的产品。
  • 匿名
2013-05-23 12:24:58
为铸铝活塞在销毂收缩孔问题之上在铸件过程中,根据孔的形成的原因从多有叉的方法,例如模子设计最优化,铸件生产被证明的铸件过程的设备配置和改善,提出五种解答有效地解决销毂孔的问题,产品质量的最后目的符合产品的技术需要。
  • 匿名
2013-05-23 12:26:38
以上销老板缩孔问题在铸造过程中,根据从多管齐下的方式,比如模具设计优化、 洞的形成原因铸造铝活塞铸造设备配置和铸造的改进过程生产证明、 拟议的五个解决方案,以有效地解决问题的销老板孔,产品质量符合技术要求的产品的最终目的。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭