当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:2009年1月12日 首钢京唐联合钢铁有限公司2号5500 m3高炉干法除尘工程,热管散热器3台。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
2009年1月12日 首钢京唐联合钢铁有限公司2号5500 m3高炉干法除尘工程,热管散热器3台。
问题补充:

  • 匿名
2013-05-23 12:21:38
January 12, 2009 Shougang Jingtang United Iron and Steel Co., Ltd. No. 2 5500 m3 blast furnace dry dust removal project, three heat pipe radiator.
  • 匿名
2013-05-23 12:23:18
January 12, 2009 Beijing shougang Tang United Steel Co. , Ltd. No. 2 blast furnace 5500 m 3 dry heat pipe radiators, dust removal works 3.
  • 匿名
2013-05-23 12:24:58
On January 12, 2009 Beijing Steel Corporation Beijing Tang unite the steel and iron limited company 2 5500 m3 blast furnace dry process dust removal project, heat pipe radiator 3.
  • 匿名
2013-05-23 12:26:38
January 12, 2009 Shougang Tang combined with iron and steel, 2nd 5500 M3 dry dedusting of blast furnace engineering, heat pipe heat sink 3.
  • 匿名
2013-05-23 12:28:18
January 12, 2009 Shougang Tang combined with iron and steel, 2nd 5500 M3 dry dedusting of blast furnace engineering, heat pipe heat sink 3.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭