当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:This is unfortunate, as the large part of the day to day operational decisions, on planning and scheduling are made by the shop floor production supervisor. The production schedule created by planners does not include all of the pertinent time factors, such as setups, changeovers and operations that require additional 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
This is unfortunate, as the large part of the day to day operational decisions, on planning and scheduling are made by the shop floor production supervisor. The production schedule created by planners does not include all of the pertinent time factors, such as setups, changeovers and operations that require additional
问题补充:

  • 匿名
2013-05-23 12:21:38
这是不幸的,很大一部分的一天的日常经营决策,规划和调度的车间生产主管。规划师创建的生产计划不包括所有相关的因素,如设置,转换和操作,需要额外的劳动援助。生产调度过程中不占这些因素导致延误。企业必须能够快速响应客户的需求和生产的变化。实现这一目标,制造商需要一种技术,最大限度地减少处理时间,并允许调度决策发生在制造工艺水平
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
这是不幸的,作为每日经营决策的大部分,关于计划,并且预定由车间生产监督员做。 计划者创造的生产日程不包括要求另外的辛苦协助的所有恰当时间因素,例如设定,转换和操作。 不占这些因素在生产日程计划期间导致延迟。 公司必须迅速反应顾客需要和制造业变动。 要实现这个宗旨,制造商要求使处理时间减到最小并且准许预定决定发生在制造过程水平的一个技术
  • 匿名
2013-05-23 12:26:38
这是不幸的作为大一部分,日常的经营决策、 规划和调度由车间生产主管。由规划师创建的生产计划不包括所有相关的时间因素,如、 设置和操作,需要额外的劳动提供援助。在生产调度过程中占这些因素不会导致延误。公司必须快速响应客户的需求和生产的变化。为了实现这一目标,制造商需要一种技术,最大限度减少处理时间,并允许调度决定要发生在制造工艺水平
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭