当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:本项目用电负荷估算约2500千瓦左右。10KV高压配电主干线路电源由三门峡市区变电站架空引入,电缆支持点采用电杆与线塔相结合方式。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
本项目用电负荷估算约2500千瓦左右。10KV高压配电主干线路电源由三门峡市区变电站架空引入,电缆支持点采用电杆与线塔相结合方式。
问题补充:

  • 匿名
2013-05-23 12:21:38
Of the project's electricity load estimates about 2,500 kilowatts. 10kv high voltage distribution trunk line power substation overhead introduced by the Sanmenxia city, cable support point using a combination of pole and line tower.
  • 匿名
2013-05-23 12:23:18
Load the project estimated at some 2.5 million watts. 10 high-voltage power distribution backbone router KV power by gate 3 gorges city substation overhead introduced cable support point-to-use power pole tower.
  • 匿名
2013-05-23 12:24:58
This project uses electricity about the load estimate approximately 2500 kilowatts.The 10KV high pressure power distribution branch line power source is built on stilts the introduction by the Sanmen Straits urban district transformer substation, the electric cable support spot uses the telephone po
  • 匿名
2013-05-23 12:26:38
Load this project estimated around 2,500-kilowatt. 10KV distribution backbone power introduced by overhead in sanmenxia district substation, used at cable support Tower of power poles and lines combined.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭