当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:介绍国电万安水电厂左岸非溢流坝段裂缝的检查方法、检查结果、裂缝成因分析、危害性分析以及加固处理的重点控制项目,为今后出现类似情况时提供一些处理经验。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
介绍国电万安水电厂左岸非溢流坝段裂缝的检查方法、检查结果、裂缝成因分析、危害性分析以及加固处理的重点控制项目,为今后出现类似情况时提供一些处理经验。
问题补充:

  • 匿名
2013-05-23 12:21:38
Introduction of the Guodian Wanan hydroelectric power plant on the left bank non spillway crack and inspection methods, inspection results, the analysis of crack initiation, to provide some experience in handling the criticality analysis, as well as reinforcement process the focus control project fo
  • 匿名
2013-05-23 12:23:18
On the left bank 10,000 on water power plants as well as non-OVERFLOW The check method of cracks, fissures, and causes the results analysis, hazard analysis, as well as reinforcement of key control project for the future, when a similar situation with some experience with.
  • 匿名
2013-05-23 12:24:58
Introduced the international telegram Wan An hydroelectric power plant left bank non-overfall dam section crack the inspection method, the inspection result, the crack origin analysis, the hazardous analysis as well as the reinforcement processing key control project, for has when from now on the si
  • 匿名
2013-05-23 12:26:38
Introduced in wanan hydropower station left bank of non overflow dam crack inspection method, inspection results, analysis of cracks, reinforcement of hazard analysis and critical control projects, in order to provide some experience in handling similar situations in the future.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭