当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The IC was re-established at 0.52 ± 0.11 g m-3 for biofilter A and at 0.55 ± 0.10 g m-3 for biofilter D, with both of them being fed in downflow mode. The bioreactors were operated at an EBRT of 240 s for 12 days, 120 s for 9 days, 60 s for 6 days and 40 s for 3 days.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The IC was re-established at 0.52 ± 0.11 g m-3 for biofilter A and at 0.55 ± 0.10 g m-3 for biofilter D, with both of them being fed in downflow mode. The bioreactors were operated at an EBRT of 240 s for 12 days, 120 s for 9 days, 60 s for 6 days and 40 s for 3 days.
问题补充:

  • 匿名
2013-05-23 12:21:38
IC被重新确立为生物滤池在0.52±0.11 G M-3,a和0.55±0.10 G M-3为生物滤池ð,他们两个人被送入下流模式。生物反应器中,操作在EBRT 240秒为12天,9天,6天,3天的40秒60秒120秒。
  • 匿名
2013-05-23 12:23:18
IC是重新确立了在0.52±0.11g M3的一个计划,在0.55±0.10G M3的计划D、与这两个国家被送入在下沉气流模式。 bioreactors的经营的ebrt在240S12天,120s9天,60s6天和40s3天。
  • 匿名
2013-05-23 12:24:58
集成电路被重建了在0.52 ± 0.11 g m-3为biofilter A和在0.55 ± 0.10 g m-3为biofilter D,当他们两个哺养downflow方式。 生物反应器被管理在EBRT 240 s 12天, 120 s 9天, 60 s 6天和40 s 3天。
  • 匿名
2013-05-23 12:26:38
IC 是重新建立在 0.52 ± 0.11 g m-3 为生物滤池 A 和 0.55 ± 0.10 g m-3 为生物滤池 D,跟他们送入下行模式中两个。生物反应器在运作上 EBRT 240 12 天,120 s s 9 天,60 6 天和 40 s s 3 天。
  • 匿名
2013-05-23 12:28:18
IC 在 0.52 处被重新建立?0.11 g 生物过滤器的 m-3 A 和在 0.55?0.10 g 生物过滤器的 m-3 D,利用他们俩人在 downflow 模式中被喂养。生物反应堆在 240 s 的一 EBRT 12 天来被操纵, 120 s 9 天来, 60 s 6 天来和 40 s 3 天来。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭