当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The landfill full of the ditch, after the construction of block of conduits (pipelines with the recovering of 30 cm described in 5.2.2), will be done with sieved soil, by successive layers of 0.20 m thick, watered and compacted by processes mechanical or manual, until the time of execution of the appropriate box for th是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The landfill full of the ditch, after the construction of block of conduits (pipelines with the recovering of 30 cm described in 5.2.2), will be done with sieved soil, by successive layers of 0.20 m thick, watered and compacted by processes mechanical or manual, until the time of execution of the appropriate box for th
问题补充:

  • 匿名
2013-05-23 12:21:38
的沟,垃圾填埋场建设的块管道(管道30厘米的5.2.2中所描述的恢复)后,将与过筛的土壤,0.20米厚的连续层,浇水,压实机械的过程或手动执行适当的方块,直到时间的类型甲板更换
  • 匿名
2013-05-23 12:23:18
充分的堆填区的沟渠,在块的导管(管道复苏的30cm5.2中所述),将详细审议、仔细推敲土壤,通过连续图层的0.2米厚,淡化和压缩过程的机械或手动,直到时间执行相应的框中,键入要替换的甲板
  • 匿名
2013-05-23 12:24:58
充分垃圾填埋垄沟,在输送管道(管道块的建筑以在5.2.2 cm描述的恢复30)之后,将做与被筛的土壤,由0.20 m连续层数厚实,由过程浇灌并且变紧密机械或手工,直到适当的箱子的施行的时候为甲板的种类替换
  • 匿名
2013-05-23 12:26:38
完整的沟里,垃圾填埋场建设的块的管道 (管线与恢复 5.2.2 中所述的 30 厘米),将会通过用筛分的土壤、 0.20 米厚的连续的图层后浇水和碾压工艺机械或手动,直到执行的适当的框类型的甲板上,以更换的时间
  • 匿名
2013-05-23 12:28:18
充满水沟的垃圾,在一批的渠道的建造之后 ( 具 30 厘米的恢复过来的管道在 5.2.2 中描述 ),将在被过程喝水和压缩的 0.20 米的拥挤的
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭