当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:包头海平面废次钠污水处理PLC控制系统(项目主要负责人),独立完成西门子S7-300-PLC软冗余控制系统设计,完成上位机WinCC画面组态和下位机Step7编程,并全程完成项目现场调试,后期独立完成整个项目维护。处理后污水合格率由35%提升到8%。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
包头海平面废次钠污水处理PLC控制系统(项目主要负责人),独立完成西门子S7-300-PLC软冗余控制系统设计,完成上位机WinCC画面组态和下位机Step7编程,并全程完成项目现场调试,后期独立完成整个项目维护。处理后污水合格率由35%提升到8%。
问题补充:

  • 匿名
2013-05-23 12:21:38
Baotou sea level waste times sodium sewage treatment plc control systems (project leader), independently Siemens s7-300-plc software redundancy control system design, to complete the host computer wincc screen configuration and lower machine step7 programming, and full completion of the project site
  • 匿名
2013-05-23 12:23:18
As well as spent time sea level Header sewage PLC control system (project manager) and independent Siemens S 7 - 300 - PLC soft redundant control systems design, and complete the WinCC picture group mentality and the 7 bit machines Step programming and debugging with completion of the project site,
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
Sea-level sodium waste water treatment PLC control system in baotou (project head), Siemens S7-300-PLC soft design of redundancy control system independently, complete PC configuration and WinCC screens slave Step7 programming and full on-site commissioning to complete the project, later complete th
  • 匿名
2013-05-23 12:28:18
The Baotou sea level unusable sodium sewage treatment PLC control system (project main person in charge), the independence completes Simens the S7-300-PLC soft redundancy control system design, completes the position machine WinCC picture configuration and the lower position machine Step7 programmin
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭