当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:说明:1、设备基础、管穿墙留洞等由土建专业施工,施工时必须与土建专业密切配合,核对无误后方可施工。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
说明:1、设备基础、管穿墙留洞等由土建专业施工,施工时必须与土建专业密切配合,核对无误后方可施工。
问题补充:

  • 匿名
2013-05-23 12:21:38
Description: equipment foundations, pipe through the wall holes left by the construction of civil engineering professionals, construction must closely cooperate with the civil engineering profession, after verification before construction.
  • 匿名
2013-05-23 12:23:18
Description: 1, device based, managed through walls and left by the construction professional construction, with the construction must be built to work closely with professionals before you can verify, and construction.
  • 匿名
2013-05-23 12:24:58
Explanation: 1st, the equipment foundation, provides clothing the wall keeps the hole and so on by the construction specialized construction, when the construction must with the construction specialized close coordination, after the checkup unmistakable only then construct.
  • 匿名
2013-05-23 12:26:38
Instructions: 1 basis, equipment, pipe wall hole by the civil engineering construction, construction must cooperate closely with the civil engineering, construction until certified.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭