求翻译:四是合理设计进度。对可能造成项目延误的主要原因是深入分析,充分估计项目的难度,给予满足项目进度的时间。要对迪拜旋转塔建设中可能遇到的技术问题充分估计,及时解决,保证进度。加强资金管理,减少由于资金缺乏导致的项目停工。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
四是合理设计进度。对可能造成项目延误的主要原因是深入分析,充分估计项目的难度,给予满足项目进度的时间。要对迪拜旋转塔建设中可能遇到的技术问题充分估计,及时解决,保证进度。加强资金管理,减少由于资金缺乏导致的项目停工。
问题补充:

  • 匿名
2013-05-23 12:21:38
The fourth is a reasonable design schedule. May result in project delays, mainly due to in-depth analysis to fully estimate the difficulty of the project, the time given to meet the project schedule. To fully estimate the technical problems that may be encountered in the Dubai rotating tower constru
  • 匿名
2013-05-23 12:23:18
4 is a reasonable design progress. The project could cause a major cause of delay is in-depth analysis of the project, estimated to be met, the difficulty of the progress of the project. To rotate the Dubai tower-building the technical issues are fully resolved in a timely manner, and estimated that
  • 匿名
2013-05-23 12:24:58
Four is the reasonable design progress.To creates the project delay the primary cause is possibly the thorough analysis, estimated fully the project the difficulty, gives satisfies the project progress the time.Must technical question full estimate which possibly meets to the Dubai rotary column con
  • 匿名
2013-05-23 12:26:38
Four is the rational design of progress. May result in project delays due mainly to the in-depth analysis of fully estimating item difficulty, time given to meet the project's progress. Dubai rotating Tower construction technical issues that you might encounter in fully estimated, and resolved in a
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭