求翻译:12.2.9.6. Acceptance Criteria: Unless stated otherwise in the performance specification, the operation may be disrupted during the negative pulses and the load dump pulse but shall return to normal operation after the pulse(s) is completed. This is class C operation in the ISO 16750 standard. The operation may not be d是什么意思?

待解决 悬赏分:1 - 离问题结束还有
12.2.9.6. Acceptance Criteria: Unless stated otherwise in the performance specification, the operation may be disrupted during the negative pulses and the load dump pulse but shall return to normal operation after the pulse(s) is completed. This is class C operation in the ISO 16750 standard. The operation may not be d
问题补充:

  • 匿名
2013-05-23 12:21:38
12.2.9.6。验收标准:(S)的性能规格除非另有说明,操作可能会在负脉冲和抛负载脉冲的干扰,但应返回到正常操作后的脉冲完成。这是在ISO 16750标准的C类业务。操作可能不会被打乱在正脉冲负载突降除外。这是在ISO 16750标准的A类操作。
  • 匿名
2013-05-23 12:23:18
12.2。 验收标准:除非特别说明,否则在性能技术指标,该操作可能会中断在负脉冲和负载转储脉冲,但应返回到正常操作脉冲之后(s)已完成。 这是C类操作在ISO16750标准。 该操作可能会在不受干扰的积极脉冲除加载转储。 这是一个操作的类的ISO16750标准。
  • 匿名
2013-05-23 12:24:58
  • 匿名
2013-05-23 12:26:38
12.2.9.6.接受条件: 除非另有说明的性能规格中,操作可能