当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The analysis above has suggested to Bombardier that trackcircuit monitoring has an important role to play in reducingthe very real and immediate problem of train delay minutes.However, before proposing a system it has to be accepted thatthere are a number of constraints that must be considered是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The analysis above has suggested to Bombardier that trackcircuit monitoring has an important role to play in reducingthe very real and immediate problem of train delay minutes.However, before proposing a system it has to be accepted thatthere are a number of constraints that must be considered
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
上面分析建议了对投炸弹者trackcircuit监视有一个重要角色扮演在reducingthe非常火车延迟分钟的真正和直接问题。然而,在提出系统之前它必须是被接受的thatthere是必须考虑的一定数量的限制
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
分析上面向炮兵军士表明了监测的 trackcircuit 有一种重要作用在 reducingthe 中扮演火车延迟的很实际和即时的问题 minutes.However,提议 thatthere 是必须被考虑的一些约束必须被接受的一个系统之前
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭