求翻译:道路工程的施工工序:定位放线→路基施工、压实→放线支模→钢筋设置→砼浇筑→路面压缝、切缝→灌缝。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
道路工程的施工工序:定位放线→路基施工、压实→放线支模→钢筋设置→砼浇筑→路面压缝、切缝→灌缝。
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
Road works in Operation: The on-line → Roadbed construction, real-time → on line support templates → steel poured on behalf Settings → → surface pressure seamless, all seamless → tank seamless.
  • 匿名
2013-05-23 12:24:58
Road engineering construction working procedure: The localization puts the line -> roadbed construction, the compaction -> puts the line mold -> steel bar establishment -> tong construction -> road surface to press the seam, the kerf -> fills the seam.
  • 匿名
2013-05-23 12:26:38
Road engineering construction process: locating lines →, compaction for subgrade construction formwork reinforcement settings → → → line → poured with concrete pavement joints, cutting and sewing → filling.