求翻译:为了保证施工人员的进出安全,隔离专门的人行道路,道路宽1.5~2m,人行道和施工临时道路之间用硬维护进行隔离。在施工的不同时期,临时道路将依据现场的进度情况进行调整,届时还将充分考虑其他兄弟单位的交叉作业的需求。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
为了保证施工人员的进出安全,隔离专门的人行道路,道路宽1.5~2m,人行道和施工临时道路之间用硬维护进行隔离。在施工的不同时期,临时道路将依据现场的进度情况进行调整,届时还将充分考虑其他兄弟单位的交叉作业的需求。
问题补充:

  • 匿名
2013-05-23 12:21:38
1.5 ~ 2m, in order to ensure the safety of construction workers out, isolating special sidewalk Road, road width between the sidewalk and construction of temporary roads with a hard Maintenance isolation. In different periods of construction, temporary road will be adjusted based on the progress of
  • 匿名
2013-05-23 12:23:18
In order to ensure the construction personnel secure access, specifically the people who isolate Road, the road width 1.5 to 2 M, and sidewalks and the road construction between the use of hard to isolate. During the construction of the different time periods, the temporary road will be based on pro
  • 匿名
2013-05-23 12:24:58
In order to guarantee constructor's turnover safety, isolates the special sidewalk road, said road width 1.5~2m, between the sidewalk and the construction temporary road carries on the isolation with the hard maintenance.In the construction different time, the temporary road will carry on the adjust
  • 匿名
2013-05-23 12:26:38
In order to ensure the construction of personnel security, isolation of specialized sidewalk road, road width 1.5~2m, construction of sidewalks and temporary roads with hard maintaining isolation. In different periods of construction, temporary roads will be adjusted in terms of progress on the grou