当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:设施人员在安装注塑机电源时没有安装接地线,设施部和安全员检查时检查出问题,避免大事故发生是什么意思?

待解决 悬赏分:1 - 离问题结束还有
设施人员在安装注塑机电源时没有安装接地线,设施部和安全员检查时检查出问题,避免大事故发生
问题补充:

  • 匿名
2013-05-23 12:21:38
Facility personnel in the installation of the power of the injection molding machine is not installed ground wire, Facilities Department and security guards check check problems to avoid big accidents
  • 匿名
2013-05-23 12:23:18
Facilities personnel installed in the power supply to the machine without the grounding wire, the Ministry of Infrastructure and security check, check, to avoid the accident.
  • 匿名
2013-05-23 12:24:58
The facility personnel when installs the injection molding machine power source does not have the installment meets the grounding, when the facility department and the safety officer inspection to inspect has problems, avoids the major accident occurring
  • 匿名
2013-05-23 12:26:38
Facility personnel grounding is not installed during installation of plastic injection molding machine of power, Department of facilities and security check is checking the problem, avoid big accidents
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭