求翻译:采用挖掘机振动锤进行振动拔桩。振动拔桩是利用振动锤对板桩施加振动力,扰动土体,破坏其与板桩间的摩阻力和吸附力并施加吊升力将桩拔出。这种方法效率高、操作简便,操作简便。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
采用挖掘机振动锤进行振动拔桩。振动拔桩是利用振动锤对板桩施加振动力,扰动土体,破坏其与板桩间的摩阻力和吸附力并施加吊升力将桩拔出。这种方法效率高、操作简便,操作简便。
问题补充:

  • 匿名
2013-05-23 12:21:38
Excavator vibratory hammer vibration tension piles. Vibration pile pulling vibratory hammer to exert vibration force of the sheet pile, disturbed soil, the destruction of their friction and adhesive force between the sheet pile and imposed by the crane lift pile to pull out. This method, high effici
  • 匿名
2013-05-23 12:23:18
The excavator vibration hammers to remove vibration pile. Remove Use vibration pile is piling on the plate vibration hammer imposed vibration, disturbance and destruction of their Commonwealth, with the board between piles of resistance and suction power and exert force to lift the pile. This means
  • 匿名
2013-05-23 12:24:58
Uses the excavator to vibrate the hammer to carry on the vibration pile pulling.The vibration pile pulling is uses the vibration hammer to the sheet pile infliction vibration power, the perturbation soil body, destroys it and exerts the hoist strength with the sheet pile friction and the adsorptive
  • 匿名
2013-05-23 12:26:38
Used excavators, vibratory hammer vibration pile pulling. Vibration of pile pulling imposed vibration force is the use of vibration hammer on sheet piles, disturbed soils, undermining its and friction between the pile and the absorption of imposing suspension lift and rip the pile. This high efficie
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 