当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:为防止打桩时把相邻的已打桩标高的桩因磨擦作用而带入土中,要求每打好一根桩就要在顶部用电焊与相邻的桩相固定,连接成一片,加大抗磨擦力。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
为防止打桩时把相邻的已打桩标高的桩因磨擦作用而带入土中,要求每打好一根桩就要在顶部用电焊与相邻的桩相固定,连接成一片,加大抗磨擦力。
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
In order to prevent the pile has been piling elevation of the adjacent piles of friction with the ground, for every good one pile to the top of the pile with the adjacent welding is fixed, the connection, and anti-friction.
  • 匿名
2013-05-23 12:24:58
In order to prevent cuts in line when but neighboring has cut in line the elevation pile to bring because of the abrasion to be buried, requests each dozen pile to have fixes in the crown with the electric welding and the neighboring pile, connects one piece, enlarges the anti-frictional force.
  • 匿名
2013-05-23 12:26:38
To prevent piling piling adjacent elevation caused by friction of piles in the ground, requires that each play a pile will be welded at the top is fixed with the adjacent piles, connected into a greater resistance to friction.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭