求翻译:打桩前先将施工影响区域内的杂物和荷载清除干净,按设计钢板桩位置向外移动10cm定出施打钢板桩轴线。对裸露放坡的土体进行喷射C15细石混凝土处理,并做好基坑顶得防排水措施。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
打桩前先将施工影响区域内的杂物和荷载清除干净,按设计钢板桩位置向外移动10cm定出施打钢板桩轴线。对裸露放坡的土体进行喷射C15细石混凝土处理,并做好基坑顶得防排水措施。
问题补充:

  • 匿名
2013-05-23 12:21:38
Piling debris and load to be cleaned before construction impacts within the region moves out 10cm set of injections of steel sheet pile axis position according to the design of steel sheet pile. Slope the soil exposed to jet c15 fine stone concrete processing, and make a pit roof waterproofing and d
  • 匿名
2013-05-23 12:23:18
Before piling works will be in the region and the load of the debris cleared, according to the design, steel piles to move a 10 cm steel pile axis shot against. On the slope of the naked body and spray C 15 fine stone concrete processing, and do a good job-pit-drainage measures.
  • 匿名
2013-05-23 12:24:58
Front will cut in line constructs first affects in the region the sundry goods and the load elimination is clean, outward will move 10cm according to the design steel sheet pile position to decide on executes hits the steel sheet pile spool thread.To exposed puts the slope the soil body to carry on
  • 匿名
2013-05-23 12:26:38
Effect piling before construction of clean of debris and load, according to the design of steel sheet pile location moves outward 10cm setting injection axis of steel sheet piles. Bare, sloping Jet C15 fine stone concrete processing of soil, and Foundation pit waterproofing and drainage measures.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 