当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:对缺陷部位加以整修,同时对两侧锁口用一块同型号长2~3m的短桩作通过试验,以2~3人拉动通过为宜。钢板桩基本使用新的,逐根进行检查,检查锁口和桩身的平整度。对于锁口已打坏且无法修正的、桩身扭曲变形的应弃之不用。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
对缺陷部位加以整修,同时对两侧锁口用一块同型号长2~3m的短桩作通过试验,以2~3人拉动通过为宜。钢板桩基本使用新的,逐根进行检查,检查锁口和桩身的平整度。对于锁口已打坏且无法修正的、桩身扭曲变形的应弃之不用。
问题补充:

  • 匿名
2013-05-23 12:21:38
Defective parts to be refurbished, with a through experiments with the model length 2 ~ 3m of piling on both sides of the locking, 2 to 3 people to pull through appropriate. The basic use of new steel sheet pile, to be checked by the root, check the flatness of the locking and pile. Locking broke an
  • 匿名
2013-05-23 12:23:18
In the defect area to be renovated, and two side locks to a block used to model long 2 to 3 m of piling through the test, in order to make 2 to 3 pull through. basic use of the new steel piles, one by one, check out port and pile of flatness. For lock port has been damaged and cannot be amended, the
  • 匿名
2013-05-23 12:24:58
Renovates to the flaw spot, simultaneously closes up an opening to the both sides with the same-type bugler corporal 2~3m stub does together through the experiment, draws take 2~3 people passes suitably as.The steel sheet pile uses basically newly, carries on the inspection by the root, the inspecti
  • 匿名
2013-05-23 12:26:38
To renovation the defect parts, lock on both sides at the same time with a model with the longer 2~3M short pile through experimentation, suitable to 2~3 pull through. Basic use of steel sheet pile of the new, check one by one, check the lock and piles of flatness. Lock is broken and cannot be amend
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭