井点埋设面至基坑底面距离(m) 取4.55m
问题补充:

  • 匿名
2013-05-23 12:21:38
Buried surface to the pit bottom surface of the well point distance (m) take 4.55m
  • 匿名
2013-05-23 12:23:18
wells were planted at the bottom side to the base distance (M) from 4.55 M
  • 匿名
2013-05-23 12:24:58
Takes 4.55m the well point embedment surface to the hole excavated for building foundation bottom surface from (m)
  • 匿名
2013-05-23 12:26:38
Planting distance between surface and bottom face of the Foundation pit well point (m) access to 4.55m
  • 匿名
2013-05-23 12:28:18
pound is laid to the pit bottom distance (M) The 4.55 m;
 
 