当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:2011年,欧洲新建海上风电场共有15座,其中2座风电场已经完全建成并成功并网;3座风电场采用漂浮式海上风机概念是什么意思?

待解决 悬赏分:1 - 离问题结束还有
2011年,欧洲新建海上风电场共有15座,其中2座风电场已经完全建成并成功并网;3座风电场采用漂浮式海上风机概念
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
In 2011, the European new offshore wind farm a total of 15 seats, 2 of which the wind farm has been completely constructed and successfully and internet; 3 wind farm in floating sea wind turbine concept
  • 匿名
2013-05-23 12:24:58
In 2011, the European newly built sea winning side electric field altogether has 15, 2 wind electric field already completely completed and succeeds the incorporation; 3 wind electric fields use the float type marine air blower concept
  • 匿名
2013-05-23 12:26:38
In 2011, the new offshore wind farms in Europe a total of 15 seats, which 2 wind farm has been fully completed and successfully connected to;-3 wind farms using floating offshore wind turbine concept
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭