当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:先把临时油加热线断开,然后把油加热线W210从机尾部分后侧机脚的方孔中穿入金属走线槽,剪去合适的长度,把线剥好,1和2号线从接线盒右侧的管接头穿入接线盒,把接地线留在外面,压好OTJ 1-6端子,固定在接地螺纹孔上。把另外两根线用红色塑料端子把加热棒线连接起来。接好后把接线盒盖子盖好,拧紧螺丝。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
先把临时油加热线断开,然后把油加热线W210从机尾部分后侧机脚的方孔中穿入金属走线槽,剪去合适的长度,把线剥好,1和2号线从接线盒右侧的管接头穿入接线盒,把接地线留在外面,压好OTJ 1-6端子,固定在接地螺纹孔上。把另外两根线用红色塑料端子把加热棒线连接起来。接好后把接线盒盖子盖好,拧紧螺丝。
问题补充:

  • 匿名
2013-05-23 12:21:38
The first temporary tank disconnect the hotline, then add the oil hotline w210 penetration from the tail section rear machine foot square hole in the metal wire tray, cut a suitable length, line stripping, line 1 and 2 penetrate the junction box ground wire to stay out from the junction box on the r
  • 匿名
2013-05-23 12:23:18
First disconnect the fuel line, and then the oil W hotline 210 from the tail portion of the back side of the pin hole into the metal slot on-line, come to the right of the cut length of wire strippers, good, 1 and 2 from the terminal block through a fitting right into the junction box, and the groun
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
First to temporary oil plus hotline disconnect, then to oil plus hotline W210 from machine tail part Hou side machine feet of Fang Kongzhong wearing into metal go line slot, shear to suitable of length, to line stripping good, 1 and Line 2 line from wiring box right of tube connector wearing into wi
  • 匿名
2013-05-23 12:28:18
The temporary oil hot wire separation, then penetrates oil hot wire W210 from in the airplane tail partial rear end undercarriage square edged orifice the metal to walk first the trunking, cuts the appropriate length, line exhausted good, 1 and 2 line penetrates the connecting box from connecting bo
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭