当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:工程项目风险预防通常以工程技术为主,在工程活动开始之前就采取一定的措施,减少风险因素,以达到减少损失和伤亡的目的。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
工程项目风险预防通常以工程技术为主,在工程活动开始之前就采取一定的措施,减少风险因素,以达到减少损失和伤亡的目的。
问题补充:

  • 匿名
2013-05-23 12:21:38
Engineering project risk prevention is usually the main engineering, to take certain measures before the start of the project activities, to reduce the risk factors, in order to achieve the purpose of reducing the losses and casualties.
  • 匿名
2013-05-23 12:23:18
Project risk prevention is usually to engineering and technology-based activities in the project before you begin to take a certain amount of measures to reduce risk factors, in order to reduce losses and injuries.
  • 匿名
2013-05-23 12:24:58
Before the engineering project risk prevention usually by the project technology primarily, starts in the project activity takes certain measure, reduces the risk factor, achieves the reduced loss and the casualties goal.
  • 匿名
2013-05-23 12:26:38
Project risk prevention are often dominated by engineering technology, prior to the start of project activities on certain measures, reduction of risk factors in order to achieve the purpose of reducing losses and casualties.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭