当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:专业班组主要施工项目有:整个土建结构包的钢结构、压型板屋面和墙体的施工;室内外埋地管道的施工;防雷和接地系统施工、路灯、屋面防水,水暖通风空调的施工,用电照明等的施工。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
专业班组主要施工项目有:整个土建结构包的钢结构、压型板屋面和墙体的施工;室内外埋地管道的施工;防雷和接地系统施工、路灯、屋面防水,水暖通风空调的施工,用电照明等的施工。
问题补充:

  • 匿名
2013-05-23 12:21:38
Professional team of major construction projects: the steel structure of the entire package of civil structures, pressure plate roof and wall construction; indoor and outdoor buried pipeline construction; the construction of lightning protection and grounding systems, street lighting, roofing, plumb
  • 匿名
2013-05-23 12:23:18
Professional crew major construction projects throughout the construction of the steel structure package, roof and wall panels for construction; indoor and outdoor buried pipeline construction; mine and ground system construction, light, water-tight roof, water heater, and construction of the ventil
  • 匿名
2013-05-23 12:24:58
The specialized teams and groups main construction project includes: Entire construction structure package of steel structure, contour plate roofing and wall construction; Room inside and outside buried pipe line construction; Anti-radar and the earth system construction, the street light, the roofi
  • 匿名
2013-05-23 12:26:38
Professional teams and major construction projects are: the entire package of civil structures, pressure plate roofing and walls of steel structure construction; indoor and outdoor construction of buried pipeline; lightning protection and grounding system construction, street lighting, roofing, cons
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭