当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The work covers supplying materials, surveying the piling position, driving, splicing with welding or bolting,curing, testing concretecube and cleaning. Additional piling when the pile has been broken during driving or the deviation of pile has exceeded the tolerance.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The work covers supplying materials, surveying the piling position, driving, splicing with welding or bolting,curing, testing concretecube and cleaning. Additional piling when the pile has been broken during driving or the deviation of pile has exceeded the tolerance.
问题补充:

  • 匿名
2013-05-23 12:21:38
工作涉及提供的材料,测量打桩位置,驾驶,拼接与焊接或螺栓连接,固化,的测试concretecube和清洗。额外的打桩时,桩已在驾驶或偏离桩打破已经超出了容忍。
  • 匿名
2013-05-23 12:23:18
涵盖的工作提供材料、测量打桩位置、行驶、拼接与焊接或螺栓连接,固化、测试concretecube和清洁。 其它桩的桩柱时被打破在驾驶过程的偏差或桩柱已超过容差范围。
  • 匿名
2013-05-23 12:24:58
工作盖子提供材料,勘测打桩位置,驾驶,接合与焊接或闩上,治疗,测试concretecube和清洗。 另外的打桩,当堆在驾驶或堆的偏差期间时是残破的超出了容忍。
  • 匿名
2013-05-23 12:26:38
工作包括供应材料、 测绘的打桩工程位置,驾驶、 拼接与焊接或锚、 固化、 测试 concretecube 和清洗。额外打桩时期间驾驶或偏差的桩桩已被打破,已超出公差。
  • 匿名
2013-05-23 12:28:18
工作包括提供材料,调查堆积位置,开车,具焊接或者匆匆咽下,治好,测验的 concretecube 和清扫的连接。其他的桩堆在开车期间被破坏了时或堆的偏离超过了忍受。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭