当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:In order to meet the reservation AUG 16th 4:00 AM Los Angeles, Hong Kong non-stop flights, manufacturers optimize the arrangements for production, shipments early in the evening on the 14th, I arranged for the shuttle AUg 15Th 8:00 AM transported to the port of entry into Hong Kong, cost car shipping yuan 2500 yuan, 50是什么意思?

待解决 悬赏分:1 - 离问题结束还有
In order to meet the reservation AUG 16th 4:00 AM Los Angeles, Hong Kong non-stop flights, manufacturers optimize the arrangements for production, shipments early in the evening on the 14th, I arranged for the shuttle AUg 15Th 8:00 AM transported to the port of entry into Hong Kong, cost car shipping yuan 2500 yuan, 50
问题补充:

  • 匿名
2013-05-23 12:21:38
出货量,以满足预定8月16日4:00洛杉矶,香港的直飞航班,制造商优化生产安排,早在14日晚上,我安排航天飞机8月第15届8:00我运端口进入到香港,成本汽车运输元2500元,50盒产品,以满足客户的要求。
  • 匿名
2013-05-23 12:23:18
为了应付八月的保留16 上午4时洛杉矶、香港的非停止飞行,制造商优化安排生产、发货在夜间早在14%
  • 匿名
2013-05-23 12:24:58
  • 匿名
2013-05-23 12:26:38
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭