当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Note: All work requiring drawing approval will be put on hold until signed copies are returned to Rexnord. Failure to return signed drawings by the stated date will extend the ship date, based on engineering and shop capacity. All parts required to manufacture this gear drive are subject to prior sale.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Note: All work requiring drawing approval will be put on hold until signed copies are returned to Rexnord. Failure to return signed drawings by the stated date will extend the ship date, based on engineering and shop capacity. All parts required to manufacture this gear drive are subject to prior sale.
问题补充:

  • 匿名
2013-05-23 12:21:38
  • 匿名
2013-05-23 12:23:18
  • 匿名
2013-05-23 12:24:58
  • 匿名
2013-05-23 12:26:38
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭