当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:明洞衬砌外的排水的施工步骤和回填要求严格按照隧道工程施工的工艺标准和图纸的设计要求进行施工。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
明洞衬砌外的排水的施工步骤和回填要求严格按照隧道工程施工的工艺标准和图纸的设计要求进行施工。
问题补充:

  • 匿名
2013-05-23 12:21:38
Myeong-dong lining the steps outside the construction of drainage and backfill requirements in strict accordance with the tunnel construction process standards and design requirements for construction drawings.
  • 匿名
2013-05-23 12:23:18
Myeong-dong, lining the drainage construction steps and backfilling tunnel construction in accordance with strict standards of workmanship and drawings for the design requirements for construction.
  • 匿名
2013-05-23 12:24:58
Outside the bright hole lining work draining water construction steps and the backfill request strictly request according to the tunneling construction craft standard and the blueprint design to carry on the construction.
  • 匿名
2013-05-23 12:26:38
Myeongdong lining outside the strict construction steps and backfill for drainage of the tunnel construction technology standards and design requirements for the construction of the drawings.
  • 匿名
2013-05-23 12:28:18
Myeong-dong lining the steps outside the construction of drainage and backfill requirements in strict accordance with the tunnel construction process standards and design requirements for construction drawings.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭