当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:另外,对于钢筋砼盖板涵施工时,首先在基础和墙身施工完成后,进行预制盖板的架设。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
另外,对于钢筋砼盖板涵施工时,首先在基础和墙身施工完成后,进行预制盖板的架设。
问题补充:

  • 匿名
2013-05-23 12:21:38
In addition, for the construction of reinforced concrete culvert cover, first base and wall construction is completed, the erection of prefabricated cover.
  • 匿名
2013-05-23 12:23:18
In addition, for reinforced concrete cover plate covered during the construction, first of all, the foundation and walls after construction is completed, the erection of prefabricated cover plate
  • 匿名
2013-05-23 12:24:58
Moreover, when contains the construction regarding the steel bar tong lap, first after the foundation and the wall body construction completes, carries on prefabricates the lap erecting.
  • 匿名
2013-05-23 12:26:38
In addition, for reinforced concrete slab culvert construction, first base and wall construction is completed, erection of precast cover.
  • 匿名
2013-05-23 12:28:18
In addition, for the construction of reinforced concrete culvert cover, first base and wall construction is completed, the erection of prefabricated cover.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭