求翻译:(1)基础开挖:用全站仪放出中线及基础开挖边线,用挖掘机挖基,人工清理基础及边坡,基础处理完成后,打砼垫层,支底板模板,绑底板钢筋,浇注底板砼。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
(1)基础开挖:用全站仪放出中线及基础开挖边线,用挖掘机挖基,人工清理基础及边坡,基础处理完成后,打砼垫层,支底板模板,绑底板钢筋,浇注底板砼。
问题补充:

  • 匿名
2013-05-23 12:21:38
(1) foundation excavation: use of total station and release the middle edge of foundation excavation, excavators dug-based, manual clean-up base and slope, basic processing is complete, hit the concrete pads, support plate template, tie plate steel, pouring concrete floor.
  • 匿名
2013-05-23 12:23:18
[object Object]
  • 匿名
2013-05-23 12:24:58
(1) foundation excavates: Emits the median line and the foundation with the entire station meter excavates the sideline, cuts with the excavator, the hand cleaning foundation and the side slope, after the foundation treatment completes, hits tong the breaker strip, the ledger wall template, ties up
  • 匿名
2013-05-23 12:26:38
(1) the excavation of Foundation: Foundation excavation of using total station out of center line and line, excavator digging base, manual cleaning base and slope, basic processing is completed, hit Fm, floor template tied floor reinforcement, pouring floor concrete.
  • 匿名
2013-05-23 12:28:18
(1) foundation excavation: use of total station and release the middle edge of foundation excavation, excavators dug-based, manual clean-up base and slope, basic processing is complete, hit the concrete pads, support plate template, tie plate steel, pouring concrete floor.
 
 