当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:进行水沉淀处理措施为:施工场地的生产废水,经过滤网过滤,通过污水管输入池中沉淀,并做除油处理。经业主和环保部门认可后排放。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
进行水沉淀处理措施为:施工场地的生产废水,经过滤网过滤,通过污水管输入池中沉淀,并做除油处理。经业主和环保部门认可后排放。
问题补充:

  • 匿名
2013-05-23 12:21:38
Precipitation for water treatment measures are: the production of construction site waste water, filtered through the filter, enter the pool through the sewage pipe precipitation, and do degreasing treatment. Owners and approved by the environmental protection department after discharge.
  • 匿名
2013-05-23 12:23:18
[object Object]
  • 匿名
2013-05-23 12:24:58
Carries on the water precipitation treatment measure is: The construction location production waste water, after the mesh filtration, precipitates through the sewage pipe input pond in, and does eliminates the oil treatment.Approve after the owner and the environmental protection department discharg
  • 匿名
2013-05-23 12:26:38
Water precipitation treatment measures are: construction site production waste water, filter filter, precipitate through sewage pipes enter the pool and do oil processing. Emissions after approved by the owners and environmental protection departments.
  • 匿名
2013-05-23 12:28:18
Precipitation for water treatment measures are: the production of construction site waste water, filtered through the filter, enter the pool through the sewage pipe precipitation, and do degreasing treatment. Owners and approved by the environmental protection department after discharge.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭