当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:砼浇注:施工时分层浇注,逐层振捣,上层振捣要插入至下层5~10cm,同时要根据振捣时表面泛浆、模板缝渗透等准确判断振捣时机,做到既不欠捣也不过振。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
砼浇注:施工时分层浇注,逐层振捣,上层振捣要插入至下层5~10cm,同时要根据振捣时表面泛浆、模板缝渗透等准确判断振捣时机,做到既不欠捣也不过振。
问题补充:

  • 匿名
2013-05-23 12:21:38
Concrete pouring: the construction of layered casting, layer by layer vibrator, vibrator to be inserted to lower the upper 5 ~ 10cm, while according to the vibrating surface of the pan when the slurry, templates, sewing penetration vibrator accurately determine the timing, do not under-pound nothing
  • 匿名
2013-05-23 12:23:18
Note: During the construction process on behalf stratified pour, case-by-case basis with the upper layer 次 次 to lower you want to insert 5 ~ 10 cm, and at the same time when 次 surface under the pan syrup, templates, such as sewing infiltration 次 accurate judgment time, so that they are not owed but
  • 匿名
2013-05-23 12:24:58
tong casting: When construction the lamination casting, the cascade inspires pounds, the upper formation inspires pounds must insert to lower level 5~10cm, simultaneously must act according to inspires pounds when the superficial mudslide, the template seam seepage and so on the accurate judgment in
  • 匿名
2013-05-23 12:26:38
Concrete casting: construction layer when casting, layer by layer vibrating, upper-class vibration you want to insert to the lower 5~10cm, according to the vibrating at the same time, template, sewing surface Pan pulp permeability determine accurately the vibrating the timing, so neither owes stamp
  • 匿名
2013-05-23 12:28:18
Concrete pouring: the construction of layered casting, layer by layer vibrator, vibrator to be inserted to lower the upper 5 ~ 10cm, while according to the vibrating surface of the pan when the slurry, templates, sewing penetration vibrator accurately determine the timing, do not under-pound nothing
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭